NASA-LLIS-2796 : Lessons Learned – System or Set Configuration Verifications Prior to Operations

سازمان: NASA - National Aeronautics and Space Administration (NASA)

کلید واژه: Computers , Configuration control and data management , Configuration Management , Engineering design and project processes and standards , Ground Operations , Ground support systems , Hardware , Information Technology/Systems , Launch support systems , Launch Systems , Software

سال: 2010

زبان: English

قیمت: 425000 تومان

Array افزودن به سبد خرید

Abstract:
Configuration procedures for Launch Processing System (LPS) systems were not specifically designed to verify that all systems and end items are ready to support Operations. Over time many off-line checkouts and confidence tests have been developed for LPS systems that test interfaces, verify hardware and software readiness, and establish baseline states. Many of these tests are specifically designed for particular support activities. These procedures provide greater assurance that the LPS configuration will satisfactorily support scheduled testing.

NASA-LLIS-2796 : Lessons Learned – System or Set Configuration Verifications Prior to Operations

سازمان: NASA - National Aeronautics and Space Administration (NASA)

کلید واژه: Computers , Configuration control and data management , Configuration Management , Engineering design and project processes and standards , Ground Operations , Ground support systems , Hardware , Information Technology/Systems , Launch support systems , Launch Systems , Software

سال: 2010

زبان: English

قیمت: 425000 تومان

Array افزودن به سبد خرید

Abstract:
Configuration procedures for Launch Processing System (LPS) systems were not specifically designed to verify that all systems and end items are ready to support Operations. Over time many off-line checkouts and confidence tests have been developed for LPS systems that test interfaces, verify hardware and software readiness, and establish baseline states. Many of these tests are specifically designed for particular support activities. These procedures provide greater assurance that the LPS configuration will satisfactorily support scheduled testing.